water1 water2 water3 water4 water5 water6 water7 water8 water9 water10 water11 water12 water13 water14

Exposing a gas line

Flushing Hydrant

Hot tapping the NRSC transmission main

Installation of a flushing hydrant

Installation of an isolation valve and flushing hydrant

Isolation valve and flushing hydrant being installed

Removing large rock to facilitate installation of pipe

Typical service installed

150 mm flush point

150 mm isolation valve being installed

Automatic air release valve

Broken plow shank from ripping through hard ground

CNWP line heading in different directions

Directional drilling a pipeline crossing