Division 6 (Bassano)


Text Sizer

  • font sizeA
  • A
  • A
 

The Division 6 Contract was put into operation in March of 2016.  112 kilometres of high density polyethylene pipe was installed to service 71 locations.  If you have not yet to connected to the system and wish to do so please contact the County of Newell Office to obtain your flow emitter assembly and instructions on connecting.