![Contract 2](/vertical/Sites/%7B3679CC48-7A73-47F8-8559-BD23ACEFEFED%7D/uploads/31b92cb2474857087e0007ab99f4dbab1bf4633f.png)
Project Phase - Contract 2
This project serviced 124 locations with the installation of 53.5 kilometres of High-Density Polyethylene pipe. Construction was completed by Syncore Directional Drilling from Coalhurst.
These services are now active, and landowners can pick up their flow emitters at the County office.