Apply for a Safety Code Permit

Building and PSDS Permits require a plans review completed by the Safety Codes Inspector. If a complete and accurate application is submitted with all the required information, the review will take approximately one week.

Electrical, Plumbing and Gas Permits do not require back up information or a plans review and can generally be issued within a couple days.  

It is important to complete all fields on the application form to ensure that the inspection is complete, including number of fixtures for gas and plumbing, BTU number for plumbing, phase, voltage for electrical, etc.